Courtyard By Marriott – London City Airport

Case goods doorsets

RG Group

£800,000

Hotel

We delivered both the bedroom furniture and doorset packages for the Courtyard by Marriott London City Airport, working closely with RG Group and Marriott International from the early stages of the project.

Our team supported the design development, helping turn the initial concept into a practical solution that could be manufactured and delivered efficiently across 184 guestrooms. A prototype sample room was fast tracked, allowing the client team to review and approve materials, finishes and detailing ahead of full production.

The project was delivered during the height of the COVID 19 pandemic, bringing significant challenges across manufacturing, material availability, international supply chains, logistics and site operations. With a demanding programme already in place, careful planning and close coordination between our design, production and site teams was essential to keep the package moving.

Despite these challenges, we successfully completed the design, supply and installation of the bespoke bedroom furniture across all 184 guestrooms, together with the doorset package, on time and within budget.

Delivering a project of this scale through such a challenging period is something we are particularly proud of and demonstrates our ability to adapt, find solutions and deliver on our commitments even when circumstances are far from straightforward.

Scope
  • Bedroom Casegoods
  • Loose FF&E 
  • Install of Doorsets & Ironmongery
  • General Carpentry & Joinery
Scroll to Top